[1] Baisch, S., Pater, C. J., 2011. Geomechanical Study of Bowland Shale Seismicity. Synthesis Report, 11/2011. Warszawa
[2] Beer, T., Ziolkowski, F., 2013. Environmental Risk Assessment: An Australian Perspective. EPA, Sydney
[3] Borysiewicz, M., Kacprzyk, W., Potempski, S., et al., 2005. Wytyczne Oceny Ryzyka Środowiskowego, IOŚ Warszawa
[4] Dinca, C., Rousseaux, P., Badea, A., 2007. A Life Cycle Impact of the Natural Gas Used in the Energy Sector in Romania. Journal of Cleaner Production, 15(15): 1451-1462. https://doi.org/10.1016/j.jclepro.2006.03.011
[5] Gao, X. H., Dong, G. W. A., Liu, B. L., et al., 2018. Groundwater Environmental Impact and Supervise Recommendation in Process of Shale Gas Development in China. IOP Conference Series: Earth and Environmental Science, 191: 012047. https://doi.org/10.1088/1755-1315/191/1/012047
[6] Gasińki, T., Pijanowski, S., 2011. Zarzązanie Ryzykiem Procesie Zrónoważnego Rozwoju Biznesu, Ministerstwo Gospodarki. Warszawa
[7] Gormley, A., Pollard, S., Rocks, S., 2011. Guidelines for Environmental Risk Assessment and Management Green Leaves Ⅲ. Defra, UK
[8] Góski, M., 2009. Rynkowy System Finansowy. PWN, Warszawa
[9] Macuda, J., 2010. Środowiskowe Aspekty Produkcji Gazu Ziemnegoz Niekonwencjonalnych Złóż. Przeglą Geologiczny, 58: 266-270
[10] Meadows, D. H., Meadows, D. L., Randers, J., et al., 1973. Granice Wzrostu, Pańtwowe Wydawnictwo Ekonomiczne. PWN, Warszawa
[11] Ministry of Environment, Lands and Parks, 2000. Environmental Risk Assessment (ERA): An Approach for Assessing and Reporting Environmental Conditions, Technical Bulletin 1. British Columbia
[12] Plesiewicz, B., Suchcicki, J., Wiszniowski, J., 2011. Monitoring Sejsmiczny Szczelinowania Hydraulicznegona Otworze Łebień LE-2H, NFOŚiGW. Instytut Geofizyki PAN, Warszawa
[13] Polish Geological Institute-National Research Institute, 2011. Badania Aspektó Środowiskowych Procesu Szczelinowania Hydraulicznego Wykonanego Wotworze Łebień LE-2H, PIG-PIB. Warszawa
[14] Riva, A., D'Angelosante, S., Trebeschi, C., 2006. Natural Gas and the Environmental Results of Life Cycle Assessment. Energy, 31(1): 138-148. https://doi.org/10.1016/j.energy.2004.04.057
[15] Sapkota, K., Oni, A. O., Kumar, A., 2018. Techno-Economic and Life Cycle Assessments of the Natural Gas Supply Chain from Production Sites in Canada to North and Southwest Europe. Journal of Natural Gas Science and Engineering, 52: 401-409. https://doi.org/10.1016/j.jngse.2018.01.048
[16] Stamford, L., Azapagic, A., 2014. Life Cycle Environmental Impacts of UK Shale Gas. Applied Energy, 134: 506-518. https://doi.org/10.1016/j.apenergy.2014.08.063
[17] Sun, Y. Q., Wang, D., Tsang, D. C. W., et al., 2019. A Critical Review of Risks, Characteristics, and Treatment Strategies for Potentially Toxic Elements in Wastewater from Shale Gas Extraction. Environment International, 125: 452-469. https://doi.org/10.1016/j.envint.2019.02.019
[18] US Environmental Protection Agency (US EPA), 1992. Framework for Ecological Risk Assessment. Washington DC
[19] US Environmental Protection Agency (US EPA), 1998. Guidelines for Ecological Risk Assessment. Washington DC
[20] Westaway, R., Younger, P. L., Cornelius, C., 2015. Comment on "Life Cycle Environmental Impacts of UK Shale Gas". Applied Energy, 148: 489-495. https://doi.org/10.1016/j.apenergy.2015.03.008
[21] Yu, C.-H., Huang, S.-K., Qin, P., et al., 2018. Local Residents'Risk Perceptions in Response to Shale Gas Exploitation: Evidence from China. Energy Policy, 113: 123-134. https://doi.org/10.1016/j.enpol.2017.10.004
[22] Zhang, D. X., Yang, T. Y., 2015. Environmental Impacts of Hydraulic Fracturing in Shale Gas Development in the United States. Petroleum Exploration and Development, 42(6): 876-883. https://doi.org/10.1016/s1876-3804(15)30085-9
[23] Zhang, N. Y., Zhang, Z., Rui, Z. H., et al., 2018. Comprehensive Risk Assessment of High Sulfur-Containing Gas Well. Journal of Petroleum Science and Engineering, 170: 888-897. https://doi.org/10.1016/j.petrol.2018.07.016