Advanced Search

Indexed by SCI、CA、РЖ、PA、CSA、ZR、etc .

Volume 12 Issue 3
Sep 2001
Turn off MathJax
Article Contents
A A Ibrahim, A M Fadoul, T A Musa, Aiguo Yao. A High-Mathematical Model Optimizing Cuttings Transport in Oil Drilling Engineering. Journal of Earth Science, 2001, 12(3): 276-278.
Citation: A A Ibrahim, A M Fadoul, T A Musa, Aiguo Yao. A High-Mathematical Model Optimizing Cuttings Transport in Oil Drilling Engineering. Journal of Earth Science, 2001, 12(3): 276-278.

A High-Mathematical Model Optimizing Cuttings Transport in Oil Drilling Engineering

  • Received Date: 18 Jun 2001
  • Accepted Date: 28 Aug 2001
  • With special drilling operation equipment and specific conditions of geology, how does drilling fluid carry cuttings effectively? So far, it is still an urgent problem for drilling researchers to study. This work just aims at the actual engineering background to develop studying model. In this paper, according to non Newtonian fluid mechanics, the law of the solid liquid, two phase fluid flow and actual drilling engineering, the major factors affecting cuttings transport are drilling fluid velocity, hole inclination and fluid rheological properties. Getting a clear understanding of the law of drilling fluid and its cutting taking mechanism, this paper puts forward a model for analysis of field data and quantitative forecast of cutting taking capability of drilling fluid. The full scale annular test section was 6.1 m with 76 and 114 mm drillpipe in a 203 mm ID (wellbore diameter). Hole angle varied from 0° to 90°.

     

  • loading
  • Becker T E, Azar J J, Okrangi S S, 1991. Correlation of Mud Rheological Properties with Cuttings-Transport Performance in Directional Drilling. SPEDE, 16-24
    Fujii K, Sato M, 1965. Carrying Capacity of Liquid Flowing through Annulus of Inclined Pipe. Japanese J Assoc Pet Tech, 30: 34-39 (in Japanese)
    Huang HO, Iversen R E, 1981. The Positive Effects of Side Rake in Ucheb, Zavedenii. Neft Gas, NJ, 25- 27
    Pigott R J S, 1941. Mud Flow in Drilling. Drill. & Prod Prac, API, 91- 103
    Sifferman T R, 1974. DrillCutting Transport in Full-Scale VerticalAnnuli. JPT, 1295- 1302
    Sifferman T R, 1983. The Carrying Capacity of Drilling Fluids. Energy Sources, (1): 43- 50
    Sifferman T R, Becker T E, 1992. Hole Cleaning in Full-Scale Inclined Wellbore. SPEDE, 115
    Tomren P E, Iyoho A W, Azar J J, 1986. Experimental Study of Cutting Transport in Directional Wells. SPEDE, 43- 56
    Zamora M, 1974. Discussion of Drill-Cutting Transport in Full-Scale Vertical Annuli. JPT, 1302
    Zeidler H U, 1974. Fluid and Drilled Particle Dynamics Related to Drilling Mud Carrying Capacity: [Dissertation]. Tulsa: University of Tulsa
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Tables(2)

    Article Metrics

    Article views(846) PDF downloads(28) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return